From: The effect of coppice management on stump volume recovery in mechanized operations
m3 waste = a stem + b Dummy D × stem | ||||
---|---|---|---|---|
r 2 adj = 0.166; n = 1394; F = 140.010; p < 0.0001 | ||||
Coeff | SE | T | p value | |
a | 0.002 | 2.589 × 10−4 | 7.931 | <0.0001 |
b | 0.002 | 3.859 × 10−4 | 5.607 | 0.0044 |